As a result of the closure of the bridge crossing over the Ina River, detour proposals have been made for the section Slawecin - Nosowo along available dirt roads with poor surfaces. Sandy and muddy sections, depending on the season and forestry work.
Detour on the asphalt road to Radaczewo and further on the forest road as in the attached photos.
A short section on the provincial road in general traffic.
Sections on meadows on overgrown YOMB slabs. In the area of meadows on the Ina River in periods of high water levels possible sectional flooding and waterlogging.
Date added: 4.06.2025 r.